| Cathedral of Mary Our Queen School |
$125,000 |
| towards the cost for the installation of a Climate Control and Ventilation System for the school |
|
| Saint Pius X Church |
$54,000 |
| to replace the sound system in the church |
|
| School Sisters of Notre Dame |
$48,204 |
| to purchase and install the following equipment for their facility: a walk-in tub; 20 PTAC self-contained in-wall air conditioning/heating units; 4 electric lift chairs |
|
| SS Peter & Paul Catholic Church |
$43,563 |
| to clean all exterior surfaces of the Parish Hall and re-point two localized areas, and remove the old caulking around the windows and doors and reapply new caulking |
|
| Mgr. O'Dwyer Retreat House |
$50,000 |
| towards repairs of their swimming pool which is used during the summer by St. Vincent de Paul Society, Camp St. Vincent and Camp Glow |
|
| Our Lady of Fatima |
$38,372 |
| to replace their 53 year old boiler with a brand new boiler |
|
| Saint Ambrose Church |
$35,000 |
| to complete the renovation of their parish and community center |
|
| Seton Keough High School |
$50,000 |
| to help fund the pre-construction planning of a new Science & Technology Center |
|
| St. Francis of Assisi School |
$45,000 |
| towards repaving and relining the playground/parking lot and landscape the perimeter to be used by the students for science projects |
|
| The Villa |
$52,411 |
| to modernize the kitchen appliances (commercial oven and ice maker), upgrade nursing capability (bathing lift and scale, side-entry tub, 6 side rail beds) and replace dated furniture, (10 dressers, mirrors, nightstands), draperies and a big screen t.v., for this retirement home for the Sisters of Mercy |
|
| Archbishop Curley High School |
$63,000 |
| for the renovation of an existing science lab as part of their master facilities plan |
|
| Archbishop Spalding High School |
$25,000 |
| to assist in the cost of building the bleachers in the new Academic and Athletic Center |
|
| Catholic Charities (St. Vincent's Center) |
$68,250 |
| to provide assistance in furnishing and equipping two residential cottages and a portion of a new gym/multipurpose building |
|
| Church of St. Ann |
$65,000 |
| to help fund Phase III of their renovation project, which will restore and stabilize the interior plaster of the church, and paint all plaster work, |
|
| Holy Family School |
$49,600 |
| for replacement of 38 windows in the rear of the elementary school building |
|
| Immaculate Conception Church |
$15,000 |
| for repair and maintenance of the wet basement in the church |
|
| Institute of Notre Dame |
$70,000 |
| for fire safety improvements and for a Feasibility Study for this girls high school |
|
| Our Lady of Victory School |
$45,000 |
| to replace the current inadequate and outdated kitchen facility and equipment |
|
| Our Lady Queen of Peace |
$54,978 |
| to replace 47 windows on the back side of their 50 year old school building |
|
| St. Benedict Church |
$50,000 |
| to aid in the cost of replacing the church roof |
|
| St. Cecelia Roman Catholic Church |
$30,000 |
| to replace a concrete walkway and widening it to handicap width |
|
| St. Clare Elementary School |
$50,800 |
| to replace a quarter of their windows |
|
| St. Joseph's Church |
$50,000 |
| to fund a portion of their renovating of the interior of the church |
|
| St. Vincent De Paul Society |
$75,000 |
| to fund re-development costs, including architectural and engineering services and permits |
|
| Calvert Hall College |
$50,000 |
| towards capital construction of a Computer Lab in the New Academic Building |
|
| Catholic Community School |
$28,000 |
| for playground repair and restoration in order to provide a safer environment for students. |
|
| Faith Community of St. Casimir |
$50,000 |
| to construct a permanent ramp to assist those with disabilities, the elderly, and children in strollers |
|
| Father Charles A. Hall Elementary School |
$56,089 |
| to rehab two very old student bathrooms which are not in compliance with current building codes |
|
| Immaculate Heart of Mary School |
$48,000 |
| to be used towards Phase I of their window replacement project in which 64 windows in the front of the school will be replaced |
|
| Mount de Sales Academy |
$60,000 |
| for stripping, caulking and painting the exterior of all windows and cornices including the cupola and columns of the 1852 main building |
|
| St. Mary of the Assumption School (Govans) |
$33,896 |
| towards the cost of installing two state-of-the-art boilers, replacing those which were originally installed in 1951 |
|
| Saint Pius V Church |
$35,000 |
| towards the installation of a vertical wheelchair lift to enable handicapped and disabled persons attend worship and other services in the church and hall |
|
| Saint Stephen's School |
$50,000 |
| towards Phase Two of their window replacement project of their deteriorated 55 year old windows |
|
| St. Ann Catholic Church |
$25,000 |
| towards the replacement, rewiring and upgrades to the church recessed lighting system,, including a safer catwalk access |
|
| St. Vincent de Paul Roman Catholic Church |
$50,000 |
| to support the earth-coupled HVAC system that will be installed in the newly renovated 10,606 square foot rectory/parish center |
|
| Cathedral of Mary Our Queen |
$15,000 |
| to repair, upgrade and replace the sound system |
|
| Our Lady of Good Counsel Church |
$25,000 |
| towards installation of a new wheelchair lift to improve access to the Church |
|
| Our Lady of Grace Parish School |
$60,000 |
| towards construction cost of a library/media/computer center |
|
| Our Lady of Mt. Carmel High School |
$40,000 |
| towards completing the final phase of their window replacement project |
|
| Sacred Heart Parish |
$10,000 |
| towards reconstruction of a new playground |
|
| Sisters of St. Francis of Assisi |
$50,000 |
| towards furnishing12 new bedrooms in the renovated former motherhouse for frail elderly Franciscan Sisters of Baltimore |
|
| St. Alphonsus Rodriguez Church |
$25,000 |
| towards new furnishings for the parish center |
|
| St. Ignatius Historic Trust Fund |
$20,000 |
| for furnishings for the new conference hall/center as part of the renovation of the church's ground floor to create a worship space and community area |
|
| St. John Regional Catholic School |
$66,322 |
| challenge grant towards predevelopment expenses for the Faith in the Future new school construction Campaign |
|
| St. Joseph School (Fullerton) |
$25,000 |
| towards replacement of 83 windows |
|
| Towson Catholic High School |
$40,000 |
| towards replacement of the front facade windows |
|
| Faith Community of St. Casimir |
$80,000 |
| towards the restoration and renovation of the Old School Building to serve as a multi-purpose center, housing a Chapel for daily mass, religious education classes, Al Anon, AA, Church Council meetings, and daycare. |
|
| Mother Seton School |
$40,000 |
| to purchase a new bus to transport students from within a 70-mile radius, including Frederick, Emmitsburg and Thurmont. |
|
| Mount DeSales Academy |
100,000 |
| towards the renovation of office space, meeting rooms, and an area for school archives within the 1882 school building. |
|
| Msgr. O'Dwyer Retreat House |
$100,000 |
| towards interior and exterior renovations. The facility hosts 8,500 youth annually, representing 190 different groups that attend retreats for confirmation preparation, Leadership Institute, Students Against Drunk Drivers, bereavement support programs, several summer camps including children from the Cardinal Shehan Center and the St. Vincent de Paul Society. |
|
| St. Joseph School (Fullerton) |
$56,200 |
| to replace 59 windows in the 75 year-old elementary school building. |
|